Track Laying Articals

These are articals that relate to laying track.

07-30-06 Up and Running

After years of planning and many months of construction, the layout is up and running.

07-10-06 Trackwork Completed

 The track has been laid on the final two modules.

07-04-06 Trackwork Done On Two Modules

 After spending an hour here and an hour there, I have laid track on two out of four modules.

06-24-06 Roadbed

The roadbed for the track has been laid.  This part went quicker than I thought.

06-15-06 Track Lines Completed

The track centerlines have been transferred to the last two modules.

05-29-06 Turnout Templates and Curves

 I scanned in the turnouts as previously discussed.  I imported them in to the track design software to compare them to the templates I was using.

04-09-06 Back To Work

After waiting over two months, I received my track order.   The last couple times I have ordered from this company my order was promptly shipped.  I guess I should have bought the track locally.  Now I can get back to work.

It does look like the turnouts do not match the templates I was using in my track design software.  My plan is to scan the turnouts with my scanner.  I can import the scans in to Autocad and trace them.  Then, I can export the traces in a file format that my track design software can import.  One I create the new templates I will update my track plan.  I do not plan on any major changes unless I have to.

02-14-06 Track Lines and A Snag

I set up a work area to start drawing the track centerlines on to the new modules.

Syndicate content