2011

01-08-11 Foundations and Roads Part 8

I completed the work on the sidewalks, roads, and foundations.

Read more

01-30-11 Photo Update

I have updated the photos in the Gallery showing the overall layout at this point in construction.

Read more

02-26-11 Going Vertical Again

I started to work on the second mountain ridge on the layout. The ridge runs along the back of the brewery complex. It will help conceal the track end loop. I am designing it to be removable like the first mountain ridge.

Read more

03-19-11 Ridge Framing

I started working on the ridge structure that will eventually support the ground surface.

Read more

04-09-11 Ridge Framing Continued

I continued installing the vertical supports on the mountain ridge located behind the brewery complex.

Read more

04-23-11 Ridge Lattice

I laid down a cardboard lattice on the ridge surface.

Read more

05-14-11 Plastered Again

I placed plaster cloth on the ridge that will sit behind the brewery.

Read more

06-12-11 Ridge Smoothing

I worked on smoothing the ridge surface.

Read more

07-03-11 Blending In

I blended the removable ridge into the layout.

Read more

07-16-11 Ground Prep

I worked on preparing the ground around the brewery complex for Sculptamold

Read more

08-06-11 Ground Work

I filled in the rest of the areas around the brewery complex with Sculptamold.

Read more

08-21-11 Ground Undercoat

I painted the ground surfaces with an earth colored undercoat. This will show through any areas not covered with ground foam.

Read more

09-03-11 Ballast

I worked on ballasting the track running through the brewery complex.

Read more

09-24-11 Ridge Ground Cover

I added various ground coverings to the mountain ridge that sits behind the brewery complex.

Read more

10-15-11 Brewery Scenery

I added scenery around the brewery complex.

Read more

11-05-11 More Tanks

I added some more tanks to the brew house.

Read more

11-26-11 Corner Module 2 Scenery

I worked on the scenery on the module that sits between the brewery complex module and the original NTRAK module.